Maintenance transport system

28 Apr 2017

From 28 April 2017 up to and including 15 July 2017 there is planned maintenance in the GTS transport network. For the next network points there is a limitation of the maximum EXIT capacity:

Network point Name Maximum exit
301111 Zelzate 11 mln. kWh/h
300143 's Gravenvoeren 14 mln. kWh/h
301368 Bocholtz Vetschau 0 mln. kWh/h
300169 Bocholtz TENP 12,8 mln. kWh/h

 Above mentioned capacities are firm available. Specific transport circumstances may give the possibility of allowing higher capacities than above mentioned.